|
|
| MOQ: | 1 SET |
| Price: | 43000 USD |
| Standard Packaging: | Wooden box |
| Delivery Period: | 30 days after payment |
| Payment Method: | 30% down payment,70% balance payment |
| Supply Capacity: | 300MW per year |
An automated production system engineered for string welding of PV crystalline silicon solar cells, delivering high production capacity, high precision, and broad material compatibility.
| Product Parameter | Data |
|---|---|
| Capacity | 6800 half pcs/hour |
| Welding Manner | Infrared Welding |
| Cell Size | 166–210 mm |
| No. of Main Busbars | Main Busbar Compatibility: 10–20BB |
| Solder Wire Specifications | Round, Irregular Shape, Flat Ribbon |
| Air Consumption | ≥3200 L/min |
| Power | Average Power: 37 W; Peak Power: 45 kW |
| Weight | 13,500 kg |
| Dimensions of the Equipment | 10,800 × 2,400 × 2,650 mm (L×W×H) |
The machine performs string arrangement and welding in a fully automated sequence, with no manual handling required. It welds up to 6800 battery cells per hour, making it well suited to high-throughput module production lines.
A liquid crystal display monitors every step of the process and flags any deviation. Operators simply stand by to supervise, verify results, and remove any non-conforming units.
Multiple inspection windows on each side of the enclosure allow inspectors to observe the entire production process without interrupting operation.
Beijing X-Solar Energy Co., Ltd. was founded in 2020 and is headquartered in Beijing. It is a science and technology innovation-driven energy enterprise whose core business covers future cell R&D, flexible photovoltaic modules, building photovoltaic module production, high-end equipment manufacturing, production line delivery, and AI-CITY smart energy management services.
In July 2023, the company established its first demonstration factory, Jiangsu X-Solar Green-building Technology Co., Ltd., in Jiangyin CNBM Jetion Industrial Park. In parallel, Jiangsu YuanTeng FengSheng Intelligent Manufacturing Technology Co., Ltd., the company’s wholly-owned equipment subsidiary, delivered the world’s first “three-in-one” automatic production line to the Jiangyin base. This line is compatible with three product categories: the X-Solar Light Shadow series (flexible PV modules), the X-Solar Light Rhyme series (building PV tile modules), and the X-Solar Light Curtain series (building PV wall modules), as well as customized products. X-Solar PV series products combine architectural aesthetics, compliance with design specifications, and energy value creation, and have been widely recognized and praised by customers in China and overseas.
In 2024, the company added two regional centers in Shanghai and Guangzhou, and established the Hong Kong X-Solar Future Energy Research Institute along with overseas sales companies in Australia, Italy, Germany, Saudi Arabia, and Argentina. Through this global layout, the company provides sustainable energy products and services to many countries and contributes to the “carbon neutrality and carbon peak” goals.
1. What is the working principle of the multi-busbar photovoltaic string welder?
It mainly realizes the series connection of battery cells by precisely positioning multi-busbar photovoltaic cells through high-precision mechanical transmission working in coordination with the welding system, and then using appropriate welding processes (such as infrared welding or laser welding) to weld the busbars onto the main grid lines of the battery cells.
2. What are the advantages of multi-busbar technology compared with the traditional approach?
Multi-busbar design reduces the current transmission distance on the surface of the battery cell, decreases resistance loss, improves the photoelectric conversion efficiency of the cell, and thereby increases the power output of the module.
1. What are the commonly used welding methods and what are their characteristics?
Commonly used methods include infrared welding, which features uniform heating and relatively fast welding speed, and laser welding, which offers high precision and good welding strength but carries a relatively higher equipment cost. Different processes suit different production requirement scenarios.
2. How is the stability of welding quality ensured?
It is necessary to precisely control parameters such as welding temperature, pressure, and welding time, regularly calibrate the welding equipment, and ensure that the surfaces of the battery cells and busbars are clean and flat and that materials are of qualified quality.
1. What preparatory work needs to be done before starting the equipment?
Check whether the connections of all parts of the equipment are normal, whether there are faults in the electrical system, and whether the transmission parts can operate smoothly. Clean the welding work area and confirm that welding materials such as busbars are fully prepared.
2. What should be done if a fault alarm occurs during operation?
First, check the alarm prompt information and judge whether the problem is caused by electrical faults, mechanical faults, or abnormal welding parameters according to the equipment operation manual. If it can be resolved on site, handle it according to the steps in the manual. If not, contact professional maintenance personnel promptly.
1. How can the production efficiency of the multi-busbar photovoltaic string welder be improved?
Optimize welding parameters to reduce welding time, carry out daily maintenance to minimize downtime caused by failures, arrange production batches reasonably, and improve operator proficiency — all of these help raise efficiency.
2. What is the maximum production capacity the equipment can reach?
Different models and configurations of multi-busbar photovoltaic string welders have different production capacities. Generally, thousands of battery cells can be welded per hour; the specific figure depends on the design specification parameters of the equipment.
1. What maintenance work needs to be done on a daily basis?
Regularly clean dust and debris from the surface and interior of the equipment, add lubricating oil to the transmission parts, check the wear condition of the welding heads, calibrate welding parameters, and check whether electrical line connections are loose.
2. How often should comprehensive maintenance and overhaul be conducted?
It is recommended to conduct comprehensive maintenance and overhaul every 1 to 3 months according to the usage frequency of the equipment, to ensure that all aspects of performance remain in good condition and the machine operates stably.
1. How is the quality of products tested after welding?
Conduct appearance inspections to confirm that the welding joints are firm and free of problems such as poor welding or detachment. Professional electrical testing equipment can also be used to verify whether electrical performance indicators such as series resistance after welding meet the standards.
2. How should defective products after welding be handled?
Analyze the causes of the defects. If the issue is related to process parameters, adjust the parameters promptly. If it is a material problem, replace with qualified materials. Mark the defective products, store them separately, and handle them according to the relevant procedures for rework or scrapping.
|
|
| MOQ: | 1 SET |
| Price: | 43000 USD |
| Standard Packaging: | Wooden box |
| Delivery Period: | 30 days after payment |
| Payment Method: | 30% down payment,70% balance payment |
| Supply Capacity: | 300MW per year |
An automated production system engineered for string welding of PV crystalline silicon solar cells, delivering high production capacity, high precision, and broad material compatibility.
| Product Parameter | Data |
|---|---|
| Capacity | 6800 half pcs/hour |
| Welding Manner | Infrared Welding |
| Cell Size | 166–210 mm |
| No. of Main Busbars | Main Busbar Compatibility: 10–20BB |
| Solder Wire Specifications | Round, Irregular Shape, Flat Ribbon |
| Air Consumption | ≥3200 L/min |
| Power | Average Power: 37 W; Peak Power: 45 kW |
| Weight | 13,500 kg |
| Dimensions of the Equipment | 10,800 × 2,400 × 2,650 mm (L×W×H) |
The machine performs string arrangement and welding in a fully automated sequence, with no manual handling required. It welds up to 6800 battery cells per hour, making it well suited to high-throughput module production lines.
A liquid crystal display monitors every step of the process and flags any deviation. Operators simply stand by to supervise, verify results, and remove any non-conforming units.
Multiple inspection windows on each side of the enclosure allow inspectors to observe the entire production process without interrupting operation.
Beijing X-Solar Energy Co., Ltd. was founded in 2020 and is headquartered in Beijing. It is a science and technology innovation-driven energy enterprise whose core business covers future cell R&D, flexible photovoltaic modules, building photovoltaic module production, high-end equipment manufacturing, production line delivery, and AI-CITY smart energy management services.
In July 2023, the company established its first demonstration factory, Jiangsu X-Solar Green-building Technology Co., Ltd., in Jiangyin CNBM Jetion Industrial Park. In parallel, Jiangsu YuanTeng FengSheng Intelligent Manufacturing Technology Co., Ltd., the company’s wholly-owned equipment subsidiary, delivered the world’s first “three-in-one” automatic production line to the Jiangyin base. This line is compatible with three product categories: the X-Solar Light Shadow series (flexible PV modules), the X-Solar Light Rhyme series (building PV tile modules), and the X-Solar Light Curtain series (building PV wall modules), as well as customized products. X-Solar PV series products combine architectural aesthetics, compliance with design specifications, and energy value creation, and have been widely recognized and praised by customers in China and overseas.
In 2024, the company added two regional centers in Shanghai and Guangzhou, and established the Hong Kong X-Solar Future Energy Research Institute along with overseas sales companies in Australia, Italy, Germany, Saudi Arabia, and Argentina. Through this global layout, the company provides sustainable energy products and services to many countries and contributes to the “carbon neutrality and carbon peak” goals.
1. What is the working principle of the multi-busbar photovoltaic string welder?
It mainly realizes the series connection of battery cells by precisely positioning multi-busbar photovoltaic cells through high-precision mechanical transmission working in coordination with the welding system, and then using appropriate welding processes (such as infrared welding or laser welding) to weld the busbars onto the main grid lines of the battery cells.
2. What are the advantages of multi-busbar technology compared with the traditional approach?
Multi-busbar design reduces the current transmission distance on the surface of the battery cell, decreases resistance loss, improves the photoelectric conversion efficiency of the cell, and thereby increases the power output of the module.
1. What are the commonly used welding methods and what are their characteristics?
Commonly used methods include infrared welding, which features uniform heating and relatively fast welding speed, and laser welding, which offers high precision and good welding strength but carries a relatively higher equipment cost. Different processes suit different production requirement scenarios.
2. How is the stability of welding quality ensured?
It is necessary to precisely control parameters such as welding temperature, pressure, and welding time, regularly calibrate the welding equipment, and ensure that the surfaces of the battery cells and busbars are clean and flat and that materials are of qualified quality.
1. What preparatory work needs to be done before starting the equipment?
Check whether the connections of all parts of the equipment are normal, whether there are faults in the electrical system, and whether the transmission parts can operate smoothly. Clean the welding work area and confirm that welding materials such as busbars are fully prepared.
2. What should be done if a fault alarm occurs during operation?
First, check the alarm prompt information and judge whether the problem is caused by electrical faults, mechanical faults, or abnormal welding parameters according to the equipment operation manual. If it can be resolved on site, handle it according to the steps in the manual. If not, contact professional maintenance personnel promptly.
1. How can the production efficiency of the multi-busbar photovoltaic string welder be improved?
Optimize welding parameters to reduce welding time, carry out daily maintenance to minimize downtime caused by failures, arrange production batches reasonably, and improve operator proficiency — all of these help raise efficiency.
2. What is the maximum production capacity the equipment can reach?
Different models and configurations of multi-busbar photovoltaic string welders have different production capacities. Generally, thousands of battery cells can be welded per hour; the specific figure depends on the design specification parameters of the equipment.
1. What maintenance work needs to be done on a daily basis?
Regularly clean dust and debris from the surface and interior of the equipment, add lubricating oil to the transmission parts, check the wear condition of the welding heads, calibrate welding parameters, and check whether electrical line connections are loose.
2. How often should comprehensive maintenance and overhaul be conducted?
It is recommended to conduct comprehensive maintenance and overhaul every 1 to 3 months according to the usage frequency of the equipment, to ensure that all aspects of performance remain in good condition and the machine operates stably.
1. How is the quality of products tested after welding?
Conduct appearance inspections to confirm that the welding joints are firm and free of problems such as poor welding or detachment. Professional electrical testing equipment can also be used to verify whether electrical performance indicators such as series resistance after welding meet the standards.
2. How should defective products after welding be handled?
Analyze the causes of the defects. If the issue is related to process parameters, adjust the parameters promptly. If it is a material problem, replace with qualified materials. Mark the defective products, store them separately, and handle them according to the relevant procedures for rework or scrapping.